Home / Business Intelligence / Alstom signs contract for Cairo Metro Line 1 extension
Alstom signs contract for Cairo Metro Line 1 extension

Alstom signs contract for Cairo Metro Line 1 extension

Alstom has signed a contract with the National Authority for Tunnels (NAT) for the extension of Cairo Metro Line 1 from the El-Marg to New El-Marg station. Alstom’s share of the contract is worth €12 million.

The project will include the construction of 1.2 km of double tracks and one new station (New El-Marg) that will have to be connected to the main line and to the control centre of Line 1. The extension will allow NAT to provide a more efficient service in the area of El Marg, which is carrying more and more passengers every day. Alstom’s scope of work for this project includes the design, supply and installation of power supply, signalling and telecommunications equipment. Works will not interrupt the operation of the line and will last 24 months.

On December 2015 Alstom had already been awarded by NAT a contract to provide a signalling system to equip the new maintenance depot of the same Line 1 which is the backbone of the Greater Cairo underground metro network and has a ridership of 2 million passengers per day.

Check Also

Nokia's communications network to support railway operations on Malaysia's first mass rapid transit line

Nokia’s communications network to support railway operations on Malaysia’s first mass rapid transit line

Nokia has supplied a mission-critical communications network to LG CNS – a Korea-based systems integrator …

Leave a Reply

Your email address will not be published. Required fields are marked *