Bosnia and Herzegovina Railway Public Corporation has launched an tender invitation (2014/S 024-037140)  for the upgrade of the signaling–telecommunication system along two lines Banja Luka- Doboj and Sevarlije-Doboj-Samac. This Invitation for Tenders follows the General Procurement Notice for this project which was published in ‘Procurement Opportunities’ on the EBRD website: 22 November 2013. The closing date for submitting bids is 20th March 2014.

Contract 1 – Modernization signalling-telecommunication system along Railway line Banja Luka- Doboj- and Sevarlije-Doboj-Samac.

The Employer now invites sealed tenders from contractors for the following contract to be funded from part of the proceeds of the loan.

Projects along the line parallel to Corridor X consist of following:

• Interstation dependence system S.Kostajnica — until Banja Luka all included.

• Interlocking of the level crossing ‘Rasadnlk” at km 12+307 (located between the caution signal and the entry signal of the station Stanovi)

• Interlocking of the station Ostruznja, which contains the following:

– Station signalling devices with interstation dependence system (MZ) Stanovi Ostrunja

– Stanari, along with procurement and laying of cables for local telephony

– Electric point heating system

– Power supply system from the OCL and distribution network Low-voltage cable network and energetics

– Revitalization of the station building with adaptation of the technical rooms

– Rehabilitation of the station tracks (except for the running track) according to the requirements for installation of signalling devices

• Point heating system at the station Stanari

• Interlocking of the level crossing Kulasi at km 35+365 (located at the interstation distance Dragalovci – Prisoje)

• Point heating system at the station Prisoje

• Interlocking of the station Snjegotina, which contains the following:

– Station signalling devices with interstation dependence system (MZ) Ukrina — Snjegotina — Josavka, along with procurement and laying of cables for local telephony

– Electric point heating system

– Power supply system from the OCL and distribution network

– Low voltage cable network and energetics

– Revitalization of the station building with adaptation of the technical rooms

– Rehabilitation of station tracks (except for the running track) according to the requirements of installation of signalling devices

• Interlocking of the station Josavka, which contains the following:

– Station signalling devices with interstation dependence system (MZ) Snjegotina — Josavka — Celinac, along with procurement and laying of cables for local telephony

– Electric point heating system

– Power supply system from the OCL and distribution network

– Low-voltage cable network and energetics

– Interlocking of the station level crossing at kin 70+925

– Revitalization of the station building with adaptation of the technical rooms

– Rehabilitation of the station tracks (except for the running track) according to the requirements for installation of signalling devices

• Interlocking of the station Celinac, which contains the following:

– Station signalling devices with interstation dependence system (MZ) Joavka — Celinac Vrbanja, along with procurement and laying of cables for local telephony

– Electric point heating system

– Power supply system from the OCL and distribution network

– Low-voltage cable network and energetics

– Interlocking of the station level crossing at kin 79+419

– Revitalization of the station building with adaptation of the technical rooms

– Rehabilitation of the station tracks (except for the running track) according to the requirements for installation of signalling devices

• Interlocking of the station Vrbanja, which contains the following:

– Station signalling devices with interstation dependence system (MZ) Celinac Vrbanja — Banja Luka, along with procurement and laying of cables for local telephony

– Electric point heating system

– Power supply system from the OCL and distribution network

– Low-voltage cable network and energeties

– Interlocking of the station level crossing at km 88+692

– Revitalization of the station building with adaptation of the technical rooms

– Rehabilitation of the station tracks (except for the running track) according to the requirements for installation of signalling devices

• Interlocking of the station Banja Luka, which contains the following:

– Station signalling devices with interstation dependence system (MZ) Celinac — Vrbanja — Banja Luka, along with procurement and laying of cables for local telephony

– Electric point heating system

– Power supply system from the OCL and distribution network

– Low-voltage cable network and energetics

– Constructive adaptation of technical rooms

– Rehabilitation of the station tracks (except for the running track) according to the requirements for installation of signalling devices

• Procurement and installation of external and internal telecommunication equipment with cable and Optical Fiber Cable at the official points Sevarlije, Doboj, S.Kostajnica, Rudanka, Stanovi, Dragalovci, Ukrina, Snjegotina, Joavka, Celinac, Vrbanja and Banja Luka.

Projects along the Corridor Vc consist of following:

• Completion of the existing interlocking system at the station Samac

• Completion of the existing interlocking system at the station Modrica

• Completion of the existing interlocking system at the station Koprivna Gornja

• Interlocking of the station Sevarlije, which contains the following:

– Station signalling devices with interstation dependence system Sevarlije

– Doboj on both tracks, along with procurement and laying of cables for local telephony

– Electric point heating system

– Power supply system from the OCL and distribution network

– Low-voltage cable network and energetics

– Revitalization of the station building with adaptation of the technical rooms

– Rehabilitation of the station tracks according to the requirements for installation of signalling devices

It is estimated that the Construction Contract will have duration of 12 Months plus Defect Notification Period of 12 months.

Prospective tenderers may obtain further information from, and inspect and acquire the tender documents at, the following office:

Bosnia and Herzegovina Railway Public Corporation and The Railway of Republika Srpska – ZRS, Project Implementation Unit (PIU). Attention: Mr. Dragan Calovic. Street Address: Kneza Milosa 105. City: Doboj. Postal Code: 74000. Country: Bosnia and Herzegovina. Facsimile number: +387 (0)53241788 +387 (0) 3322 3098. Electronic mail address: bhzjkdo@teol.net or dragan.calovic@zfbh.ba

Source*TED Europa Supplement to the Official Journal of the European Union; photo*ZFBH

Check Also

Nokia's communications network to support railway operations on Malaysia's first mass rapid transit line

Nokia’s communications network to support railway operations on Malaysia’s first mass rapid transit line

Nokia has supplied a mission-critical communications network to LG CNS – a Korea-based systems integrator …

Leave a Reply

Your email address will not be published. Required fields are marked *