Home / EMEA / EBRD: Montenegro Railways Emergency Infrastructure Rehabilitation Project

EBRD: Montenegro Railways Emergency Infrastructure Rehabilitation Project

Railways of Montenegro for Infrastructure ‘ŽeljeznickaInfrastrukturaCrne Gore AD  (ZICG)”  intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development (the Bank) towards the cost of a project to undertake emergency rehabilitation of the railway infrastructure.

The works on the Vrbnica –Bar line for track rehabilitation with the length of the section Kolašin – Kos (open line) of 9.864,70 m, the length of station tracks of 786,67 m for 1st track;  828,86 m for 2nd track (running track) and 794,21 m for 3rd track and with the railway line electrified 25 kV, 50 Hz single-phased system and with single-track and standard gauge, in two (2) lots, will include:

LOT 1:                      ‘Kolasin-Kos’

Open track (km 340+991.60 – km 350+856.27) repair and change of the existing track components (superstructure) with electrical devices and services. Completion time is 12 months

 

LOT 2:                      Station ‘Kos’

Main track (km 350+856.27 – km 351+685.13)

Station tracks (km 350+857.25 – km 351+684.69) repair and change of the existing track components (superstructure) and switches with electrical devices and services. Completion time is 8 months

Works on Lot 1 and Lot 2 are to be performed concurrently.

Tenders are invited for one or more lots.  Each lot must be priced separately.  Tenders for more than one lot may offer discounts and such discounts will be considered in the comparison of tenders.

CONTACTS

Mrs. Tatijana Bulatović
Željeznicka Infrastruktura Crne Gore AD  (ZICG)
TrgGolootočkihžrtava 13
81000 Podgorica, Montenegro
Tel: +382 20 441 450 / +382 69 319 408
Fax: +382 20 441 235
E-mail: tatjana.bulatovic@zicg.me

Check Also

Nokia's communications network to support railway operations on Malaysia's first mass rapid transit line

Nokia’s communications network to support railway operations on Malaysia’s first mass rapid transit line

Nokia has supplied a mission-critical communications network to LG CNS – a Korea-based systems integrator …

Leave a Reply

Your email address will not be published. Required fields are marked *