Home / EMEA / FYR Macedonia: Service contract notice for supervision for renewal with reconstruction of the railway section Bitola–Kremenica

FYR Macedonia: Service contract notice for supervision for renewal with reconstruction of the railway section Bitola–Kremenica

Macedonian Ministry of Finance, Central Financing and Contracting Department (CFCD) published a service contract notice for supervision for renewal with reconstruction of the railway section Bitola–Kremenica, part of Coridor X.

Contract specification

6.Nature of contract:

Fee-based.
7.Contract description:

The purpose of this contract is to provide supervision services for reconstruction of the non-electrified single-track railway section Bitola–Kremenica of a length of approx. 17 km, as part of Xd of corridor X in accordance with FIDIC ‘Conditions of contract for building and engineering works designed by the employer’, first edition 1999 — FIDIC ‘Red Book’.
The consultant shall ensure that services for supervision shall be in accordance with all the requirements for quality control, control of quantities, supervision of the work progress, analyses of expenses, implementation of the environmental criteria as well as working on administrative questions during the rehabilitation works and defect liability period.
The works on this section of the railway line include the following main activities: renewal of approx. 17 km (from km 129,310 to km 146,190) of the permanent way with increasing the bearing capacity; construction of 1 station at Zabeni and reconstruction of 1 halt at Kravari including track alignment (sidings); 10 level crossings in this section will be converted into secured level crossings; 6 existing bridges to be demolished and constructed anew; 3 existing bridges to be demolished and replaced with culverts; belonging signalling and telecommunication and ERTMS (level 1).
Design speed is 100 km/h, axle load: 22,5 tonnes, structural gauge: UIC C. The subject section will be closed for railway operations during the performance of the works.
8.Number and titles of lots:

No, 1 lot only.
9.Maximum budget:

1 000 000 EUR.
10.Scope for additional services:

The contracting authority may, at its own discretion, extend the project in duration and/or scope subject to the availability of funding up to a maximum not exceeding the length and value of the initial contract. Any extension of the contract would be subject to satisfactory performance by the contractor.

The provisional date of invitation to tender is 1.6.2014.

EuropeAid/135413/IH/SER/MK.

 

Check Also

Nokia's communications network to support railway operations on Malaysia's first mass rapid transit line

Nokia’s communications network to support railway operations on Malaysia’s first mass rapid transit line