Home / EMEA / Montenego: Tender for tunnels rehabilitation works on Vrbnica – Bar railway line

Montenego: Tender for tunnels rehabilitation works on Vrbnica – Bar railway line

Railways of Montenegro for Infrastructure ‘Željeznicka Infrastruktura Crne Gore AD  (ZICG)” intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development (the Bank) towards the cost of a project to undertake emergency rehabilitation of the tunnels.

ZICG invites sealed tenders from contractors for the following contract to be funded from part of the proceeds of the loan:

The works on the Vrbnica –Bar line for tunnels rehabilitation: the tunnel no 187 is located on the Belgrade-Bar railway line, between passing point Kos to Trebešica on km 353+657,39 – 353+895,93 (the total length of 238.54 meters), the tunnel no 190 is located 7-9 km from the station Trebjesica to Kolasin on km 364+831,93 – 356+271,93 (the total length of the tunnel is 1440 m); the tunnel no 193 is located 5-6 km from the station Trebjesica to Kolasin on km 357+235,96 – 357+631.96 (the total length of the tunnel is 396 m), in one contract, will include:

  • Tunnel no 187 at km 353+657.39 – km 353+895.93
  • Tunnel no 190 at km 354+831.93 – km 356+271.93
  • Tunnel no 193 at km 357+235.96 – km 357+631.96

Completion time for all works under the contract is 18 months.

Tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms from any country.

More information is available http://www.ebrd.com/work-with-us/procurement/p-pn-150609a.html

Check Also

Nokia's communications network to support railway operations on Malaysia's first mass rapid transit line

Nokia’s communications network to support railway operations on Malaysia’s first mass rapid transit line

Nokia has supplied a mission-critical communications network to LG CNS – a Korea-based systems integrator …

Leave a Reply

Your email address will not be published. Required fields are marked *