Rehabilitation of Macedonian Railways rolling stock maintenance depot

Macedonian Railways Transport JSC Skopje (MRTJSC) intends to use part of the proceeds of a loan from the European Bank for Reconstruction and Development (EBRD) towards the cost of the Macedonian Railways Rehabilitation Project which forms part of the overall Macedonian Railways Fleet Renewal Project (the Project).
MRTJSC now invites sealed tenders from eligible Contractors for the following contract to be funded from part of the proceeds of the loan:
Rehabilitation of MRTJSC Rolling Stock Maintenance Depot, Skopje:
The maintenance depot comprises the following main sections:
Hall 1:   Corridor, workshops, chemical laboratories, staff amenities and wash facilities;
Hall 2a: Diesel and electric locomotives servicing;
Hall 2b: Diesel locomotives servicing;
Hall 3:   Bogie servicing and bogie lift;
Hall 4a: Machine shop, electromotor servicing, small machine tools;
Hall 4b: Bogie servicing;
Hall 5:   Electric Multiple Unit (EMU) and Diesel Multiple Unit (DMU) repairing.
The Works on the maintenance depot will generally include the following:

Architecture/Civil Works
Installation of new insulated roof structure system over the existing roof structure;
Removal of existing main external doors and installation of new main external doors;
Removal of damaged external glazing and installation of new external glazing;
Installation of new external and internal facade system;
Removal of damaged internal flooring system and installation of new flooring system;
Installation of new internal wall partitions and internal doors;

Installation of new LED lighting system;
Installation of new external lighting system;
Installation of fire protection system;
Installation of lightning rod onto new roof structure system.
Installation of new photovoltaic system onto new roof structure system.

Removal of existing ventilation system and installation of new ventilation system;
Check, clean and put in operation existing heating system;
Check, clean, removal of existing oil burners in the central boiler system and installation of new oil/gas burners;

Tenderers must submit a tender for the entire Works as a single offer. Partial offers will not be considered.
Works will be carried out under the FIDIC Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer – 1st edition 1999 (the Red Book).
The Time for Completion is expected to be 12 months from the Commencement Date, plus a Defects Notification Period of 365 days.
More details are available at the following link: http://www.ebrd.com/work-with-us/procurement/p-pn-150317a.html

Check Also


Samsung and Russian Railways sign MoU for Silk Road Project

 Samsung Electronics and Russian Railways have signed in Moscow a memorandum of understanding for collaboration …

Leave a Reply

Your email address will not be published. Required fields are marked *