Home / EMEA / Romania: FCC consortium awarded 39 EUR million additional works contract for Sighisoara – Atel railway segment

Romania: FCC consortium awarded 39 EUR million additional works contract for Sighisoara – Atel railway segment

CFR SA has directly awarded FCC Construcción-Azvi consortium a RON 173 million (39 EUR million) additional works contract on Sighisoara – Atel railway segment.

Additional works are necessary due to the unforeseen soil conditions encountered by the contractor. Works involve specific objects of the first contract: Sighisoara and Danes tunnelsbridges and overpasses, the stabilisation of the soil with hydraulic binder. 

In 2012, FCC Construction, in a joint venture with ALPINE and Azvi  won the 246 EUR million contract for the railway rehabilitation and modernization of Braşov-Simeria line, section Sighişoara-Aţel (28,26 km). 

Photo:Sighisoara-Atel-Micasasa

Check Also

Nokia's communications network to support railway operations on Malaysia's first mass rapid transit line

Nokia’s communications network to support railway operations on Malaysia’s first mass rapid transit line

Nokia has supplied a mission-critical communications network to LG CNS – a Korea-based systems integrator …

Leave a Reply

Your email address will not be published. Required fields are marked *