Home / EMEA / RUB 16 bn in 2014 for the project “Reconstruction and development of the Small Ring of the Moscow Railway”

RUB 16 bn in 2014 for the project “Reconstruction and development of the Small Ring of the Moscow Railway”

second railway ring_MoscowJSC Russian Railways continues the project for the reconstruction and development Small Ring of Moscow Railway.

In 2014, within the delegated limit of capital investments (16.04 billion rubles) it is planned to reconstruct 95 km of the permanent way, installing 3101 catenary poles, 225 km of lines to be provided signaling&control systems, as well as install communication systems along 64 km of line. Reconstruction works for 11 civil engineering structures will be carried,  the construction of 15 stopping points and and also installment of noise protection screens on along 108 km of line.

Starting from 2016 Moscow Ring Railway will carry more than 250 million passengers annually. 100 pairs of electric trains will run daily with an interval of up to 5 minutes in rush hours.

Check Also

Nokia's communications network to support railway operations on Malaysia's first mass rapid transit line

Nokia’s communications network to support railway operations on Malaysia’s first mass rapid transit line

Nokia has supplied a mission-critical communications network to LG CNS – a Korea-based systems integrator …

Leave a Reply

Your email address will not be published. Required fields are marked *